|
|
|
Kyneton yard. Thur 26/05/05 |
Down end opf Kyneton earthworks. Thur 26/05/05 |
looking towards Taradale viaduct. Thur 26/05/05 |
Taradale looking towards Malmsbury. Thur 26/05/05 |
More signal gantry parts arrive by road at Elphinstone. Thur 26/05/05 |
New signal Gantry being lowered into place at Elphinstone, Thur 26/05/05 |
Bendigo, Thistle St looking towards Golden Square. Sun 22/05/05 |
Kangaroo Flat, looking south. Sun 22/05/05 |
Golden Square looking south. Sat 21/05/05 |
Hunter St Over bridge in Golden Square looking Nth. Sat 21/05/05 |
Kangaroo Flat station looing south. Sat 21/05/05 |
Kangaroo Flat station looing south. Sat 21/05/05 |
Kangaroo Flat Station looking north. Sat 21/05/05 |
Kangaroo Flat station looing south. Sat 21/05/05 |
Kangaroo Flat looking towards Melb from the station. Tue 05/04/05 |
Kangaroo Flat Station showing demolished No 2 Platform. Tue 05/04/05 |
KP 153 between Kangaroo Flat and Big Hill. Tue 05/04/05 |
Between Kangaroo Flat & Big Hill. Tue 05/04/05 |
Looking towards Kangroo Flat Tsation from the up end. Fr 01/01/05 |
The new set of points at Porcupine Hill. A brilliant piece of design work. Tue 01/03/05 |
Malmsbury station. Thur 24/02/05 |
Malmsbury station looking sth. Thur 24/02/05 |
Woodend looking sth Thur 24/02/05 |
Woodend Station. Thur 24/02/05 |
Looking nth Between Malmsbury & Taradale. Thur 24/02/05 |
Looking south between Taradale & Malsmbury. Thur 24/02/05 |
Looking nth towards Taradale. Thur 24/02/05 |
New points on the approach to Taradale viaduct. Thur 24/02/05 |
Near Taradale looking sth. Thur 24/02/05 |
Porcupine hill, now with points joining the down line to the up line. Thur 24/02/05 |
Porcupine hill, now with points joining the down line to the up line. Thur 24/02/05 |
Baulk placed over the main line in Bendigo yard. 29/01/05. |
Castlemaine looking back to the station. A Peco medium radius point has been shifted into position. Thur 03/02/05 |
| | | |